This is
the interior after adding the carpeting, fabric and 'upholstery'. Turned out nicer
than I thought it might. Still have to make a 'boot' for the control stick.
Here are the alternate and main battery after
having been moved to the baggage compartment. The battery solenoid on the right is
attached with riv-nuts.
Here I am underneath the baggage floor installing
wiring and stiffeners while desperately trying not to collapse the aft fuselage.
Test fitting the wings. This was the 2nd
time the left wing had been on and the first time the right wing was on. Found that
the ailerons were too long by about 3/8". Drilled out the end rib and
trimmed the aileron down and reinstalled rib.
Weight and balance time. First time with
most everything in place. Used two $50 non-electronic bathroom scales under the main
gear and an electronic one for the tail.
Almost forgot to install the prop and spinner for
the W&B.
For more pictures, including the first flight, click here.
To First Page