Builder's Log

All times are approximate. Times include the stuff I've addedsince the first flight, which occurred at approximately 650 hours total buildtime. Not all flights are logged.

Entries with photographs are marked with

Total build time as of
Total build time as of 7/4/06: 737.5 hours
Total analysis time: 71.9 hours
TOTAL TIME: 809.4 hours
Total Flight Time 480.0 hours

DATE

BUILD and

ANALYSIS

TIME (hours)

FLIGHT

TIME

DESCRIPTION SUMMARY

07/01/2006 0.0 0.6 Flew to Kelly Airpark Breakfast
10/16/2005 0.0 1.0 Flew to 17,500 MSL
07/30/2005 0.0 7.5 Flew to Oshkosh
06/12/2004 0.0 3.0 Camped at Dolores Point airstrip
09/06/2003 0.0 2.2 Flew to Lamar Fly-in
08/02/2003 0.0 8.5 Returned to Meadow Lake
07/30/2003 0.0 0.8 Baraboo to Oshkosh
07/29/2003 0.0 7.7 Flew to Baraboo, WI
07/13/2002 0.0 3.3 Landed Colorado Springs
07/12/2002 0.0 13.8 Flew Back to Colorado from New Hampshire
07/07/2002 0.0 17.7 Flew to New Hampshire
08/21/2001 0.0 5.2 Flew to KS, OK, TX, NM
07/25/2001 0.0 2.0 Visited Pueblo.
07/16/2001 0.0 4.2 Flew to Crested Butte
07/14/2001 0.0 3.0 Replaced front main seal on engine
07/01/2001 4.0 0.5 Replaced wing splice plates
03/13/2001 0.0 1.0 Just flew around
02/19/2001 0.0 Flew to highest airport in U.S.
01/28/2001 0.0 Flew to Questa, New Mexico
01/20/2001 0.0 3.0 Flew over Great Sand Dunes National Monument
01/14/2001 0.0 Flew around Pike's Peak
12/10/2000 0.0 1.0 Took a co-worker up for a flight
11/20/2000 0.0 1.0 House hunting flight
11/13/2000 0.0 6.4 Flew from American Falls, ID to Meadow Lake, CO
11/12/2000 0.0 5.5 Flew plane Scappoose, OR to American Falls, ID
11/11/2000 1.0 Painted wing tips, horiz stab first color.
11/10/2000 3.0 Stripped paint from wing and horiz stab tips.
11/09/2000 1.0 Painted second color on cowling.
11/08/2000 2.0 Painted second color on wheel pants, first on cowling
11/07/2000 1.0 Painted wheel pants, primed cowling
11/05/2000 0.0 4.0 Primed pants. Stripped cowling.
11/04/2000 0.0 5.0 Started painting wheel pants for real
10/23/2000 0.0 3.0 Flew to Oakridge State Airport
10/20/2000 0.0 2.0 Lunch at Independance State Airport
10/15/2000 0.0 Repitched propeller, Added active noise reduction to Peltor headset
10/08/2000 0.1 Calibrated aux fuel tank
10/06/2000 0.1 Installed aux fuel tank in right wing locker
10/05/2000 0.0 Finished annual condition inspection
09/30/2000 0.0 Continued annual inspection
09/29/2000 0.0 New operating limitations from FAA, Started condition inspection
08/06/2000 0.0 1.0 Took dog for a ride
08/04/2000 0.0 2.0 Flew to Cascade Locks State Airport
08/01/2000 0.0 Ferried plane to HIO, added pinstripes
07/23/2000 0.0 2.0 Finished polishing plane. Test pinstripes. Prop repitch data.
07/21/2000 0.0 Watched Blue Angels
07/13/2000 0.0 3.5 Repitched propeller
07/09/2000 0.0 Lowered radiator slightly
07/08/2000 0.1 Checked valve guides, added oil filter blast tube
07/06/2000 0.0 4.0 Flew to Arlington Fly-in
07/04/2000 0.0 1.0 Checked out fireworks
06/30/2000 0.0 Finished testing engine.
06/29/2000 0.0 Installed new battery
06/28/2000 0.0 First requal flights
06/25/2000 0.0 Remounted engine
06/23/2000 0.0 Finished putting engine back together
05/02/2000 0.0 Polished tail. Adjusted rudder pedals.
04/28/2000 0.0 Installed helicoils
04/20/2000 0.0 Removed engine from plane
04/15/2000 0.0 Found stripped engine case bolt
04/08/2000 0.0 2.0 Transponder check, Mt Rainier, Service Ceiling
04/06/2000 0.0 1.5 More clouds, unintentional battery check
04/04/2000 0.0 2.5 Trip to Willapa Bay; engine starting problem
04/02/2000 0.0 1.5 Cloud layer
03/28/2000 1.0 Started 'intermediate' painting
03/27/2000 0.0 1.5 Measured t/o and landing distances
03/25/2000 0.0 3.0 Flew around Deschutes river and Wasco State Airport
03/23/2000 0.0 1.5 Landed Hillsboro
03/20/2000 0.0 Compass still doesn't work well
03/11/2000 0.0 1.2 Adjusted belt, removed old strobe p/s, adj wheel
03/01/2000 0.0 0.3 Changed oil, replaced drive belt
02/23/2000 1.0 0.5 Installed dimmer, adjusted landing lights
02/20/2000 0.0 1.5 Flew to Nehalem Bay State Airport
02/13/2000 2.5 0.5 Finished panel lights, one landing light. First night flight.
02/11/2000 2.1 Replaced wing tips, started on oil cooler, landing lights, panel lights
02/08/2000 5.0 Installed nav/position/strobe lights
02/01/2000 0.2 1.0 Installed diffuser on heater outlet
01/31/2000 3.0 0.4 Finished cabin heat
01/29/2000 2.0 0.1 Mounted heater box
01/27/2000 3.1 Installed heater selector box
01/23/2000 2.0 Finished heater box
01/21/2000 2.0 Worked on cabin heat
01/20/2000 0.0 0.2 Preventative Maintenance
12/25/1999 0.0 2.0 Flew around St. Helens again
12/23/1999 0.0 3.5 Flew to Florence, OR
12/21/1999 0.0 2.6 Glider tests
12/18/1999 0.0 1.0 Minimum controllable RPM, t/o RPM, cold wx ops
12/11/1999 0.0 0.5 Inspected wheels and wing joints
12/06/1999 0.0 Got insurance coverage.
12/04/1999 0.0 2.0 Flew to EAA breakfast for first time.
11/26/1999 0.0 2.3 Flew around Portland
11/17/1999 0.0 0.7 Checked valve clearances
11/01/1999 0.0 2.8 Checked out Oregon coast.
10/20/1999 0.0 1.8 Flew over Mt. St. Helens
10/14/1999 0.0 4.1 Baggage capacity test
10/10/1999 0.0 2.5 First use of 100LL, flight over Mt. Hood
10/08/1999 0.0 0.4 First flight in rain
10/07/1999 0.0 1.0 Low altitude speed runs/Painting advice
10/06/1999 0.0 3.0 Crosscountry to Bremerton, WA
10/01/1999 0.0 1.8 End of Phase I flight testing. Condition inspection.
09/30/1999 0.0 0.3 Repaired Engine
09/23/1999 0.0 Big engine problems
09/16/1999 0.0 Engine problems
09/15/1999 0.0 1.8 Engine reliability testing
09/14/1999 0.0 0.9 Maximum gross weight and aft CG testing
09/13/1999 0.0 1.1 Weight testing, practice loss of controls
09/12/1999 0.0 2.0 Speed runs with wheel pants,climbs, descents
09/11/1999 0.0 2.0 First trip away from airport
09/10/1999 0.0 1.3 Fuel gage mod, played with vac regulator, 60 deg turns
09/08/1999 0.0 1.2 Compass Data
09/07/1999 0.0 1.4 More practice.
09/06/1999 0.0 1.7 Full control maneuvers, prop torque check
09/05/1999 0.0 0.3 Eleventh short hop, landing gear test, valve adj
09/04/1999 0.0 1.0 Tenth flight, 12000MSL, 45 deg turns
09/03/1999 1.0 1.4 Ninth flight, cal fuel tank, 3000ft speed runs, Vne
09/02/1999 0.3 1.3 Eighth flight, 8000MSL, baggage door stiffener
08/31/1999 0.3 1.3 Seventh flight
08/29/1999 0.0 1.6 Fifth & sixth flight
08/28/1999 0.0 1.7 Third and fourth flights
08/27/1999 0.2 0.9 *** FIRST FLIGHT *** and second
08/25/1999 1.0 First short hop
08/20/1999 0.0 More cooling, firewall buckling, taxi test
08/13/1999 0.0 Engine runup #5
08/10/1999 0.0 FAA Inspection
08/09/1999 0.0 Engine run-up in level attitude
08/08/1999 0.0 Another run-up
08/06/1999 0.0 Checked prop torques. Worked on cooling
07/30/1999 0.0 Attempted full power engine run-up
07/29/1999 0.5 Adjusted tach and fuel tank straps, changed oil
07/27/1999 0.5 Replaced copilots PTT switch, unrivetted fuse top skin
07/24/1999 0.0 Adjusted tailwheel some more
07/23/1999 0.0 More taxi testing
07/22/1999 0.0 Verified all wing bolts and control torques, did some medium speed taxiing
07/20/1999 1.0 Trimmed fairings between center wing and outside wings, more taxiing
07/17/1999 0.5 First taxi test
07/16/1999 1.0 Installed left wing. Installed prop.
07/12/1999 1.0 Attached right wing. Rivetted horiz stab fairings.
07/06/1999 0.0 Transported fuselage to airport
07/03/1999 0.5 Fixed a bug in the canopy latching system
07/01/1999 0.0 Practice loaded fuselage to trailer
06/25/1999 1.0 Moved wings to airport, continued verifying fuse
06/10/1999 0.5 Finished all fairings
05/11/1999 1.5 Retrofit right side horiz stab fairing
05/08/1999 1.0 Installed rear wheel fairings
05/01/1999 2.0 Installed brackets for 2nd wheel fairing
03/14/1999 1.0 Continued with wheel pants
03/13/1999 1.0 Worked on wheel pants
01/23/1999 0.5 Build inlet plenum for air filters, worked on cowling and wingtips some more
01/22/1999 0.0 Cut hole in garage for vent fan
01/21/1999 0.5 Used glazing putty to smooth out cowling junctions
01/20/1999 0.5 Started some body work on wingtips
01/15/1999 0.0 Checked out local paint store
01/10/1999 0.0 Ordered Hobbyair; Built lamp stands
11/08/1998 0.8 Added red and green bands to instruments
11/07/1998 0.5 Continued verifying plans; corrected a mistake
11/03/1998 0.3 Replaced radiator hose, rebolted on exhaust
10/30/1998 2.0 Remote mounted oil pressure sensor
10/28/1998 0.0 Third tech counselor visit
10/24/1998 1.0 Verified disconnected aileron travel, verified more of plans
10/20/1998 1.0 Installed secondary latch for canopy
10/05/1998 0.5 Installed elevator down stop
10/03/1998 1.0 Added weatherstripping to canopy, closed up elevator trim servo
09/30/1998 0.0 Bought a GPS. Made power cable for unit.
09/25/1998 2.0 Worked on installing wing/fuse fairings
09/20/1998 7.0 Finished aileron controls, wing-fuse fairings, final plane weighing
09/19/1998 2.0 Continued working on mating wings
09/10/1998 0.5 Rivetted forward fuselage skin in place
09/08/1998 4.0 Fixed wheel toe-out problem
08/30/1998 0.3 Retorqued prop bolts. Noted main wheel toe-out problem.
08/27/1998 0.0 Ran engine with prop
08/25/1998 1.5 Installed propeller and set prop pitch
08/22/1998 1.5 Made cowl fit better
08/21/1998 0.5 Made boot for control stick.
08/19/1998 0.5 Carpeted baggage floor
08/17/1998 0.5 Installed floor upholstery. Reinstalled fuel tank.
08/16/1998 1.5 Installed side upholstery
08/11/1998 4.0 Finished battery reinstallations
08/10/1998 5.0 Continued wiring batteries
08/04/1998 3.5 Continued moving batteries
08/03/1998 4.5 Started working on moving main battery
08/02/1998 1.0 Calculated CG
07/29/1998 6.0 Installed pitot/static tube. Test fit right wing. Weighed aircraft.
07/28/1998 0.8 Attached connectors to strobe wires on inboard wing. Made new rear Z splice pla
07/21/1998 4.5 Test fit left wing
07/19/1998 1.0 Made fairing for steps
07/18/1998 1.0 Cut out openings at center wing root
07/14/1998 0.5 Read about attaching wings
07/11/1998 2.0 Painted cockpit floor. Reinstalled pedals. Ran NAV light wires.
07/09/1998 2.0 Installed fix on brake pedals
07/08/1998 0.5 Filled brakes with red hydraulic fluid
07/06/1998 0.5 Riveted/bolted steps in place
07/05/1998 2.0 Started step installation
07/04/1998 0.5 Trimmed canopy
07/03/1998 1.0 Cut fuse-wing fairings to size
07/01/1998 1.0 Installed ELT antenna
06/30/1998 2.0 Installed screws into canopy. Found 2 cracks
06/29/1998 1.0 Found mistake on canopy frame
06/26/1998 2.0 Opened holes in canopy; installed fabric on sides
06/25/1998 2.0 Worked on canopy - painted frame
05/03/1998 2.0 Finished right side canopy lock, started canopy open mechanism
05/02/1998 3.0 Finished left side canopy latch
05/01/1998 1.0 Finished bending rear canopy tube, drilled
04/28/1998 1.0 Started 3rd canopy tube, installed primer
03/09/1998 1.0 Finished rear canopy tube
03/08/1998 2.5 Fit new rear canopy tube to canopy and drilled.
02/15/1998 0.5 Started bending new rear canopy tube
01/07/1998 1.5 Continued working on canopy latch
01/05/1998 2.5 Worked on canopy attachment system
01/02/1998 0.5 Broke rear canopy tube
01/01/1998 1.0 Continued fitting rear frame tube to canopy
12/30/1997 2.5 Started drilling canopy
12/29/1997 1.0 Remounted lower canopy hinges
12/24/1997 0.5 Measured cable tensions. Changed mind about mounting canopy.
12/20/1997 0.5 Worked on canopy
12/19/1997 2.0 Built canopy frame
12/18/1997 1.0 Continued working on canopy
12/16/1997 1.0 Started canopy frame
12/14/1997 1.0 Made bottom seat cushions
12/12/1997 1.0 Added 2nd layer of body filler to cowl junctions.
12/10/1997 1.0 Applied auto body filler to cowling junctions, added door to top cowl
12/09/1997 0.5 Finished glassing air scoop in
12/08/1997 1.0 Started glassing air scoop to cowl
12/07/1997 2.0 Glassed valve cover bubbles into cowl
12/06/1997 3.0 Worked on cowling
12/05/1997 1.0 Installed dzus fasteners on cowl
12/04/1997 1.5 Cut right valve cover hole in cowl
12/03/1997 1.5 Cut left valve cover hole in cowl
12/02/1997 2.0 Cut hole in cowl for oil pan bubble.
11/30/1997 0.0 Bought fabric for plane interior
11/26/1997 1.0 Worked on cowling
11/22/1997 2.0 Upholstered back seat cushions
11/20/1997 2.0 Worked on cowl, riveted rear top fuse skin in place
11/19/1997 3.0 Attached labels to panel, worked on cowling
11/17/1997 2.0 Started engine for 1st time
11/16/1997 2.0 Built voltage warning circuit
11/15/1997 3.0 Designed bus voltage warning circuit
11/12/1997 0.3 Installed clamping diode for battery contactor
11/11/1997 2.0 Added tabs to fix battery tray, installed and finished cabling.
11/10/1997 3.0 Made main battery tray, started cabling
11/09/1997 2.0 Started work on cowling, temp installed fuel tank
11/08/1997 0.5 Installed muffler, calibrated oil dipstick
11/07/1997 3.0 Filled and mounted radiator, coolant recovery bottle.
11/05/1997 2.0 Finished pilot's air vent.
11/04/1997 1.0 Worked on radiator hookup.
11/03/1997 2.5 Finished wiring ignitions/sensors. Installed accessory outlet.
11/02/1997 1.0 Installed fuel gage & tube. Started wiring engine/sensors
11/01/1997 3.0 Fixed & tested radio. Made decorative cover for radio/panel interface
10/29/1997 1.0 Discovered radio wired wrong. Rewired.
10/28/1997 3.0 Noticed main spar bending! Riveted top center wing panels.
10/27/1997 3.0 Installed NAV/COM
10/26/1997 4.0 Hung engine on mount. Cabled throttle & choke. Installed radiator brackets
10/25/1997 2.5 Continued working on radiator brackets. Installed FP#2/IG#2 switch.
10/24/1997 4.0 Started installing radiator. Installed ignition sw.
10/22/1997 4.0 Connected throttle rods to linkage. Installed engine mount
10/18/1997 2.0 Repositioned plane, made 2nd seat back.
10/17/1997 5.0 Installed XPDR, COM antenna, seatbelts. Started installing rear fuse top skin.
10/16/1997 3.0 Plumbed vacuum system
10/15/1997 2.0 Installed venturi tube
10/14/1997 4.0 Continued working on instrumentation, safety wired fuel system hose clamps.
10/13/1997 3.0 Installed sub-panel instr. panel
10/12/1997 2.0 Mounted instrument panel to airplane
10/10/1997 3.0 Continued working on instr panel
10/06/1997 3.0 Painted instrument panel. Wired intercom connector.
10/05/1997 5.0 Cut out instrument panel
09/30/1997 0.5 Installed lower cowling fairings.
09/29/1997 3.0 Cut sub-panel for instr panel
09/24/1997 4.0 Installed PTT switches in stick
09/23/1997 2.0 Installed NAV antenna
09/22/1997 1.0 Mounted XPDR antenna, MSD coil selector
09/21/1997 7.0 Installed rear fuse access panel & ignition coils
09/20/1997 1.0 Mounted fuel pumps & gascolator to fw
09/18/1997 1.0 Finished saddle installation. Acquired foam for seats.
09/17/1997 2.0 Cut rear top fuse skin for horiz stab
09/16/1997 0.0 Picked up engine from Stratus
09/15/1997 2.5 Finished rudder & tailwheel linkages, started fitting saddle
09/14/1997 4.0 Continued cabling elevator and attaching tail
09/09/1997 3.0 Received order from AS&S. Bolted on rudder. Started cabling elevator.
09/08/1997 5.0 Finished tailwheel install. Added fairings to rudder. Attached elevator to sta
09/07/1997 4.0 Installed baggage floor and seat bottoms
09/06/1997 3.5 Installed fuel tank.
09/04/1997 1.0 Riveted baggage floor in place. Added extra stiffener.
09/03/1997 2.0 Finished cabling rudder. Soldered alt digitizer to XPDR.
08/30/1997 2.0 Cabled rudder
08/29/1997 0.0 Ordered XPDR
08/27/1997 1.5 Installed brake center bearing. Cut cable for left rudder.
08/26/1997 3.0 Mounted rudder. Worked on brake bubble again. Test fit elevator. Purchased avio
08/25/1997 4.0 Made fittings to mount rudder
08/24/1997 3.5 Filled brake lines, made new lower rudder hinges
08/23/1997 3.5 Fitted horiz stab to fuse, routed brake lines
08/20/1997 2.0 Installed rudder peddles
08/19/1997 1.0 Continued work on throttles
08/18/1997 4.0 Started installing throttle assembly
08/14/1997 2.0 Riveted tail sections. Started fitting tailwheel to fuse.
08/13/1997 2.0 Installed bolts for lower longerons. Started making 3rd set of lower rudder hin
08/12/1997 2.5 Riveted lower longerons in place. Received firewall forward kit.
08/11/1997 3.5 EAA Tech counselor visit
08/09/1997 4.0 Installed lower right longeron
08/06/1997 2.5 Final cut on fwd fuse skin, started on wing root fairings
08/05/1997 3.0 Clekoed forward fuse skin over fuel tank in place
08/03/1997 4.0 Continued fitting middle fuse skin to tube B2, installed L stiffeners
08/01/1997 2.0 Drilled middle fuse skin to tube B2
07/30/1997 3.0 Drilled middle fuse top skin to longerons
07/24/1997 0.5 Riveted floor stiffener. Marked rivet lines on fwd fuse skin
07/23/1997 2.0 Continued work on forward fuse skin. Installed floor stiffener.
07/22/1997 4.0 Started installing forward rear fuselage skin
07/21/1997 3.0 Installed rear fuselage skin
07/20/1997 0.0 Visited another builder's just completed CH601
07/17/1997 1.0 Ran COM antenna wire
07/16/1997 3.0 Ran rear fuselage wires, adjusted aileron cables, drilled blkhd B6
07/15/1997 2.0 Installed ELT bracket, made rest of control assemblies
07/14/1997 4.0 Reassembled and riveted forward fuse. Started installing baggage floor
07/13/1997 4.0 Cabled ailerons, started reassemblying fuselage
07/10/1997 2.0 Riveted bottom of center wing
07/09/1997 4.0 Primed fuselage components
07/08/1997 4.0 Prepped and primed fuselage
07/07/1997 4.0 Cut down end of tailspring to 1.5"", started prepping for priming
07/06/1997 5.0 Drilled fuse sides skins to firewall & rear skin. Started rear fuse top skins.
07/05/1997 0.5 Drilled top of side skins to upper longeron
07/04/1997 1.0 Installed Ls between floor and side skins
07/02/1997 2.0 Installed rolled and square gussets on fwd fuse
07/01/1997 3.5 Installed L's on fwd fuselage
06/30/1997 4.5 Clecoed floor to sides. Installed fitting supports to inst. panel
06/29/1997 3.0 Started working on fwd fuse side - floor junctions
06/28/1997 2.5 Installed seat back center and side channels
06/27/1997 2.0 Finished fuse sides-wing top junction
06/26/1997 2.0 Made double-curved L's for fuselage side/wing junctions
06/25/1997 4.0 Clecoed fuse side skins, longeron doublers to longerons.
06/24/1997 0.0 Ordered supplies from AS&S.
06/23/1997 0.5 Finished cut fuselage sides
06/22/1997 0.5 Rough cut front side skins
06/21/1997 1.5 Completed baggage floor instal, cut upper longeron doublers
06/19/1997 1.0 Started installing baggage area floor
06/18/1997 1.0 Positioned instrument panel and gussets
06/17/1997 2.0 Continued installing firewall
06/16/1997 3.5 Clamped firewall in place, made upper longerons splice, gusseted longerons
06/15/1997 3.0 Attached aft fuselage to center wing, clamped longerons in place
06/14/1997 1.0 Clecoed floor skin and heel doubler to center wing bottom skin
06/13/1997 2.5 Clecoed wing uprights & floor skin
06/10/1997 2.5 Worked on control stick assemblies.
06/09/1997 0.8 Installed rear channel for torque tube bearing
06/05/1997 0.8 Clecoed arm rest sides in place
06/04/1997 3.5 Clecoed baggage floor stiffener to rear pickups, talked to Zenith
06/03/1997 3.0 Bent 2nd longeron. Fabricated gussets 6F12-2. Bent floor skin to firewall.
06/02/1997 1.0 Bent first upper longeron
05/28/1997 1.0 Reassembled rear fuselage
05/27/1997 5.0 Primed rear fuselage
05/26/1997 3.0 Installed tail frame stiffeners, disassembled rear fuselage for priming
05/25/1997 1.0 More parts on order...
05/21/1997 2.0 Worked on fitting rear tailspring pickup to fuselage
05/19/1997 2.0 Installed rudder attachment 'bearings'
05/18/1997 2.5 Installed L stiffeners for side skins
05/17/1997 0.5 Installed L stiffeners above rear top panel
05/14/1997 1.0 Clecoed top rear fuselage longerons
05/12/1997 2.0 Drilled rear fuselage side skins
05/11/1997 1.0 Finished installing left gear leg
05/08/1997 2.0 Almost installed left lower gear support
05/07/1997 3.0 Fit left gear leg and support/slides
05/06/1997 4.5 Finished right gear leg installation, riveted right leading edge skin
05/05/1997 2.0 Fit right gear leg to upper support plate
05/03/1997 4.0 Prepared replacement left upper leg support plate
05/01/1997 0.0 Received parts from ZAC
04/30/1997 3.0 Primed bottom rear fuselage and riveted
04/29/1997 5.5 Installed forward tail wheel pickup & lower longerons
04/28/1997 1.0 Worked on rear fuselage
04/27/1997 3.5 Painted firewall front, started work on tail frame
04/23/1997 4.0 Riveted firewall together
04/22/1997 7.0 Assembled firewall
04/21/1997 4.5 Installed outside seat belt attachments and rear L stiffeners
04/20/1997 1.0 Installed L's along front seat panel edges
04/18/1997 1.0 Installed seat panel with clekos.
04/16/1997 4.5 Continued work on left gear installation
04/14/1997 7.5 Finished drilling center nose skin, riveted bottom of wing. Cut out fuselage ope
04/13/1997 3.0 Drilled top left center skin and left side of center nose skin in place
04/12/1997 0.8 Drilled top right center skin
04/09/1997 4.5 Clecoed bottom nose skin, continued installing gear stiffeners.
04/08/1997 4.0 Completed installing right gear, primed bottom & nose skin
04/07/1997 5.0 Finished installing left gear assembly, started on right.
04/06/1997 5.0 Drilled bottom of center nose skin
04/05/1997 2.5 Cut lower gear leg holes in center nose skin
04/01/1997 3.0 Drilled lower skin center skin and clekoed in place
03/31/1997 1.0 Lock wired brake and wheel assemblies
03/28/1997 1.0 Made 2nd stop plate
03/27/1997 2.0 Finished 2nd upper bearing plate.
03/26/1997 1.8 Finished first upper gear bearing plate
03/25/1997 4.0 Drilled center rear Z and ribs. Started drilling hole in upper gear bearing.
03/24/1997 6.5 Worked on 2nd gear support. Primed all ribs and spar. Riveted ribs to center sp
03/20/1997 1.0 Completed 2nd gear rib assembly.
03/19/1997 3.5 Drilled both gear rib assemblies to center spar
03/18/1997 3.5 Completed one rib assembly. Bent two of the TD6V11-7 reinforcements.
03/17/1997 1.0 Ground one lower bearing to fit; made 95mm spacer
03/15/1997 1.0 Riveted one gear rib
03/14/1997 2.0 Drilled all rear ribs and non-gear front ribs to center spar
03/11/1997 3.5 Fabricated rear bearing. Drilled center rear ribs.
03/10/1997 1.5 Clekoed back channel to bottom center skin
03/09/1997 1.5 Completed 2nd aileron bell crank
03/06/1997 1.0 Clekoed aileron bell crank attachments
03/05/1997 2.0 Fabricated 1st aileron bell crank
03/04/1997 5.0 Continued work on gear ribs/legs
03/03/1997 4.5 Continued work on gear ribs
02/26/1997 1.0 Finished riveting left wing
02/25/1997 3.0 Riveted top skin of left wing
02/21/1997 0.0 EAA Tech Counselor Visit
02/19/1997 3.5 Cut down gear extrusions and rear bearings
02/18/1997 1.5 Mounted 2nd tire
02/17/1997 2.5 Cut holes in seat pan; drilled L supports
02/16/1997 2.0 Attached caliper assemblies to wheel forks. Mounted 1 tire.
02/14/1997 1.3 Fixed problem with wheel/disc brake interference
02/13/1997 0.8 Drilled wheel forks for axle
02/11/1997 2.5 Worked on gear legs
02/10/1997 3.5 Made reinforced ribs for center wing
02/08/1997 3.0 Reviewed plans for center wing and landing gear
02/07/1997 2.0 Started gathering stuff for center wing
02/02/1997 0.5 Riveted stiffeners to top main wing skin (left)
01/22/1997 3.0 Deburred and primed tip skins and main wing spars
01/20/1997 3.0 Drilled and cut to fit left wing nose tip skin
01/18/1997 2.5 Drilled left tip bottom skin.
01/16/1997 2.5 Drilled left wing tip top skin
01/14/1997 3.0 Drilled & clekoed the top of the left nose skin.
01/13/1997 3.0 Drilled & clekoed the bottom of the left nose skin
01/12/1997 1.0 Marked nose skin and ribs, flipped wing skeleton (left wing)
01/08/1997 1.5 Finished screen shields, made up wiring harness for strobe light (left wing)
01/07/1997 1.0 Riveted bottom skin
01/05/1997 1.0 Deburred ribs, primed rib flanges
01/04/1997 3.0 Deburred and primed top and bottom skins
01/02/1997 1.5 Finished left wing locker, deburred bottom skin
01/01/1997 3.0 Started left wing locker
12/29/1996 3.0 Drilled bottom skin/stiffeners on left wing
12/28/1996 3.0 Drilled top skin/stiffeners on left wing
12/27/1996 0.8 Completed riveting the left wing skeleton, resolved question
12/26/1996 1.0 Started to rivet left wing skeleton, have question about right wing...
12/24/1996 4.0 Prepped and primed ribs, spar, rear z on left wing
12/23/1996 1.0 Assembled wing tip skeleton on left wing
12/22/1996 1.0 Drilled rear Z on left wing
12/17/1996 2.0 Drilled nose and rear ribs and main spar on the left wing
12/08/1996 2.0 Riveted wing tip skins
12/07/1996 3.0 Prepped and primed right wing tip skins
12/05/1996 1.5 Installed strobe light in wing tip
12/03/1996 2.5 Positioned and drilled fiberglass right wing tip
12/01/1996 3.0 Cut right nose tip skin to fit
11/27/1996 1.5 Started positioning the tip nose skin
11/26/1996 3.5 Cut and positioned the wing tip top skin
11/24/1996 2.5 Cut and positioned bottom tip skin in place
11/22/1996 1.5 Riveted nose skin in place
11/20/1996 1.5 Riveted top skin in place
11/18/1996 1.0 Sealed off lightening holes in ribs around baggage locker
11/16/1996 2.0 Installed plastic conduit and wires in wing
11/14/1996 2.0 Tested strobe lights, found one didn't work
11/13/1996 1.0 Riveted bottom skin in place
11/12/1996 2.0 Primed the right wing skins inside.
11/11/1996 1.0 Primed the skeleton
11/09/1996 6.0 Prepped for priming
11/08/1996 0.5 Added stiffener to baggage locker
11/07/1996 1.0 Completed right wing baggage locker
11/06/1996 4.0 Worked on baggage locker (right wing), wing tip
11/05/1996 5.5 Riveted ailerons, drill top of nose skin
11/04/1996 5.5 Finished drilling ailerons, flipped right wing
11/03/1996 3.5 Drilled new aileron horns, positioned bottom of nose skin
11/01/1996 1.0 Tried to figure out twist in ailerons
10/29/1996 2.0 Drill aileron ribs, wrecked aileron horns
10/28/1996 1.3 Started Ailerons
10/27/1996 1.3 Drilled right wing bottom skin
10/25/1996 1.3 Installed right wing top skin
10/11/1996 2.0 Crimped L angles for skins, installed locker channel in right wing
10/08/1996 2.5 Attached rear Z to ribs, attached rear end rib (right wing)
10/07/1996 1.0 Attached plates and doubler to rear zee (right wing)
10/01/1996 2.5 Drilled nose and rear ribs for right wing
09/30/1996 1.0 Pulled parts for right wing
09/28/1996 3.0 Repaired horiz stab, completed riveting
09/27/1996 1.3 Screwed up horiz stab while riveting
09/26/1996 0.8 Riveted skeleton of horiz stab back together
09/24/1996 4.0 Deburred horiz stab
09/21/1996 2.5 Drill horiz stab skin/Finished riveting the elevator
09/20/1996 1.5 Drilled horiz stab skin
09/19/1996 1.0 Drilled bottom side of horiz stab
09/17/1996 5.0 Shortened spars on Horiz Stab
09/13/1996 2.0 Noticed problem with Spar Length on Horiz Stab
09/12/1996 1.0 Drilled Center ribs on Horiz Stab/Riveted elevator
09/10/1996 3.0 Positioned ribs for horiz stab, fabricated attachments
09/09/1996 3.0 Started horiz stabilizer, deburred Elevator parts
09/08/1996 1.3 Completed elevator control horns and 'L' doublers.
09/06/1996 1.5 Installed elevator trim tab
09/05/1996 2.5 Cut out hole for trim tab servo. Drilled trim tab hinge.
09/04/1996 1.3 Cut out hole for doubler in Elevator
09/01/1996 1.3 Assembled center ribs for Elevator
08/28/1996 0.0 Looked at Roy's Elevator and Horiz Stab
08/24/1996 2.0 Nose skin
08/23/1996 5.0 Rudder Nose skin
08/10/1996 2.3 Rear rudder skin
08/08/1996 2.0 Rear rudder skin
08/06/1996 1.0 Priming Rudder Skeleton
08/05/1996 3.7 Rib 4, Tip Rib of Rudder
08/03/1996 3.7 Doublers and Ribs 1,2,3 for Rudder
08/01/1996 0.0 Unpacking/Inventory